Canadian Occupational Safety

December/January 2019

Canadian Occupational Safety (COS) magazine is the premier workplace health and safety publication in Canada. We cover a wide range of topics ranging from office to heavy industry, and from general safety management to specific workplace hazards.

Issue link: https://digital.carswellmedia.com/i/1055630

Contents of this Issue

Navigation

Page 24 of 27

filters and respiratory protection for workers. Installations can sometimes be done in remote locations or near bodies of water, which bring additional risks. WEATHER Inclement weather can put solar workers in an emer- gency scenario. Wind, rain, lightning, snow and the extremes of hot and cold weather can increase the risks of all activities associated with installing solar panels on a roof, says Ontario's Infrastructure Health and Safety Association (IHSA). The association notes that working in these conditions requires increased awareness of hazards and stricter safety practices associated with fall protection, emergency planning, hoisting, rigging and housekeeping. For every job, someone needs to be responsible for checking the weather in the morning, at lunch and again in the afternoon, says Scipione. "You're working outside in the summer; anything can happen. Once the weather drops two or three degrees, you can bet the bank it's going to rain. But are we going to have lightning too with it? That's the problem," he says. "You definitely don't want to be in a field where there's A) power, B) the air is energized with electricity." Heat stress needs to be top of mind in the solar industry because the vast majority of work takes place from March to November, with summer being the busiest time. It gets up to 38 C on a rooftop very easily, so workers need to take frequent breaks in a cool area and hydrate every 20 minutes. Symptoms of heat exhaustion include: weakness, feeling faint, headaches, breathlessness and nausea. Knaggs suggests workers get to the site early and complete the heavy work first, leaving the wiring work for the afternoon. Unfortunately, many solar installers are not fol- lowing the guidelines for working in heat. "It depends on the employer, but a lot of times they are more interested in getting to the next job, getting this one finished as quickly as possible and move to the next one," says Seidel. "It almost always comes down to the point where workers are in discomfort." Ultimately, it all comes down to money. "If I am bidding on a job and I am following guidelines to make sure workers are hydrated and getting frequent breaks, I may need to add an extra day to the quote. And if my quote is a day higher in labour than my competitor's, then I'm not going to get that job," Seidel says. The pressure to get a job done quickly can take a toll on workers. With Ontario's Feed-In Tariff (FIT) program (developed in 2009 to encourage and promote greater use of renewable energy sources), installers had to hit certain operational dates or they could have lost their contract, says Knaggs. Fortunat- ely, he has not seen this time pressure have a direct impact on safety. "Most workers are pretty smart and they know that working safer is a faster way to work," he says. As an example, Knaggs points to a good guardrail system being in place. "It gives them A) confidence in their employer that he has done a whole bunch of steps to protect their well-being and B) it removes that thought of 'Hey I could fall off this roof,'" he says. "So, with the guardrail system in place, they feel more confident, so they can work better and faster." It's important that any time pressure the employer experiences does not get passed down to front-line workers. "If he is constantly on them and putting demands and pressures on them to finish a job by a certain amount of time, then that encourages shortcuts, unsafe work practice, that kind of thing," says Seidel. ERGONOMICS Musculoskeletal disorders (MSDs) are also a prob- lem within the industry. Most material-handling injuries experienced by installers are due to awk- ward postures (such as improper lifting techniques), overexertion (such as trying to lift items that are too heavy) or repetitive work tasks. Solar panels can weigh up to 50 pounds each and they are awkward to lift. "It's almost like lifting up a door. They are that kind of size and shape," says Knaggs. "You're lifting with a bit of outstretched arms because it's awkward and then twisting to put them in place." As a best practice, workers should lift and carry the solar panels in pairs. They should also be using ladder hoists to lift the panels up on the roof. Workers often find themselves underneath the panels during an installation. "Say, for example, that frame is 4 feet off the ground and you have a person who is 6 feet tall. That person is going to have to bend backwards to get up underneath that 45-degree angle to put bolts in and they are going to be doing that for eight to 10 hours a day," says Scipione. "It can become a mus- culoskeletal disorder, definitely." Offering sufficient breaks and ensuring the shorter workers are assigned to under-panel work can help reduce MSDs, he says. Workers should also do some stretching exer- cises before starting the job — but the industry is not quite there yet, Seidel says. "You're dealing with an industry that's male- dominated. It's a high-testosterone industry, trades are, so they tend to reject this kind of New Age thinking. It's 'My father, grandfather did it this way and this is the way I do it,'" he says. "I don't think people recognize the value of being prepared ahead of time to prevent injuries." EDUCATION While there currently are no formal training requirements for solar installers, they should be trained on working at heights, electrical hazards, safe transportation and lifting of mate- rials, exposure to hot or cold environments and emergency planning, for example, suggests IHSA. Seidel would like to see a formal cer- tification for solar installers sometime in the near future. "Education is always the best deterrent for injury. The more knowledge you have of a situation, how to do it, the less chance to get hurt and the greater chance to do it properly," he says, adding it will give employers more confidence in the workers too. CanSIA is looking to develop a solar training and certification program. It has presented a proposal to various government departments and agencies to seek funding support and initial interest has been strong, the association says. A certification would effectively help ensure workers follow all of the manufac- turer's instructions for solar panels — a current problem in the industry, Seidel says. "You get into a situation where to follow the manufacturer's instructions may take an extra two hours if you come across a problem with the roof, for example, whereas if you take a shortcut, you may be able to do a makeshift quick fix, but now you have hampered the system. You're not doing it 100 per cent correctly so it could pose an issue down the road," he says. "That's what happens when you have an unregulated industry. If you're an electrician and you take a short cut, you could lose your license and be out of work. But with a solar installer there is no license to lose. You just move to another employer." Workers conducting maintenance on solar systems need to be particularly vigilant because they don't know what they are walking into. "The problem maintenance workers have is gener- ally, they did not do the initial installation. They are not familiar with how it was installed. They are kind of hoping the people ahead of them did the job prop- erly," says Seidel. "There's a lot more risk involved." Before they touch anything, maintenance work- ers should conduct a visual inspection of the system and work area. Telescopic cameras can be used to see under the solar panels, rather than crawling under them. A roof video camera can also assist with remote monitoring. A lot of the maintenance workers also work alone, Seidel adds. Appropriate warning signs should be posted to notify workers of any hazards. It's important for the solar industry to do its part and get as many people trained as possible because the industry is only going to continue to grow, says Knaggs. "We are really, really close to our tipping point," he says. "Now there is awareness out there that wasn't there before. People know what solar can do and it is becoming a household item." Is there sufficient co-operation, communication and exchange of information among the building owner, site manager and workers to allow the safe performance of the work? Have workplace hazards linked to the organization of the work and work-related stress been assessed as part of the workplace risk assessment? Are there measures in place to ensure communication of information to workers who may not have a good command of the working language? When work at height is necessary, are there mobile elevating work platforms and scaffolding available? Has the condition of the roof been assessed to ensure it is dry and free from slipping and tripping hazards, such as moss, snow, ice and vent pipes? In the case of skylights or holes/cavities, are they safeguarded? Is a safe distance kept for workers, tools and materials from high voltage power lines during maintenance/repair activities? Are workers aware that low voltages can cause surprise shocks and, thereby, falls? Is work arranged so that manual handling operations, such as lifting and carrying, are avoided or reduced to a minimum? Are measures in place to avoid (or reduce to a minimum) the need for workers to work frequently or in prolonged kneeling or squatting positions? Source: European Agency for Safety and Health at Work Answering "No" to any of the following questions (just a sampling of what a comprehensive list should include) indicates a need for improvements to be made before solar systems are installed. CHECKLIST PRE-INSTALLATION

Articles in this issue

Archives of this issue

view archives of Canadian Occupational Safety - December/January 2019